CLASS NOTES ON CONSTRUCTION TECHNIQUES, EQUIPMENT & PRACTICE

Download and Upload Study Materials
Post Reply
alex
Posts: 32
Joined: Wed Jun 05, 2013 9:01 pm

CLASS NOTES ON CONSTRUCTION TECHNIQUES, EQUIPMENT & PRACTICE

Post by alex »

Hi friend it is a must download study note on CONSTRUCTION TECHNIQUES, EQUIPMENT & PRACTICES .

Format pdf, pages = 72.

It contain


CONSTRUCTION TECHNIQUES, EQUIPMENT AND PRACTICES
OBJECTIVE

The main objective of this course is to make the student aware of the various construction techniques, practices and the equipment needed for different types of construction activities. At the end of this course the student shall have a reasonable knowledge about the various
construction procedures for sub to super structure and also the equipment needed for construction of various types of structures from foundation to super structure.

UNIT I CONCRETE TECHNOLOGY
Cements – Grade of cements - manufacture of cement – concrete chemicals and Applications – Mix design concept – mix design as per BIS & ACI methods – manufacturing of concrete – Batching – mixing – transporting – placing – compaction of concrete – curing and finishing. Testing of fresh and hardened concrete – quality of concrete - Non – destructive testing.

UNIT II CONSTRUCTION PRACTICES
Specifications, details and sequence of activities and construction co-ordination – Site Clearance – Marking – Earthwork - masonry – stone masonry – Bond in masonry - concrete hollow block masonry – flooring – damp proof courses – construction joints – movement and expansion joints – pre cast pavements – Building foundations – basements – temporary shed – centering and shuttering – slip forms – scaffoldings – de-shuttering forms – Fabrication and erection of steel trusses – frames – braced domes – laying brick –– weather and water proof – roof finishes – acoustic and fire protection.

UNIT III SUB STRUCTURE CONSTRUCTION
Techniques of Box jacking – Pipe Jacking -under water construction of diaphragm walls and basement-Tunneling techniques – Piling techniques - well and caisson - sinking cofferdam - cable anchoring and grouting-driving diaphragm walls, sheet piles - shoring for deep cutting - well points -Dewatering and stand by Plant equipment for underground open excavation.

UNIT IV SUPER STRUCTURE CONSTRUCTION
Launching girders, bridge decks, off shore platforms – special forms for shells - techniques for heavy decks – in-situ pre-stressing in high rise structures, Material handling - erecting light weight components on tall structures - Support structure for heavy Equipment and conveyors -Erection
of articulated structures, braced domes and space decks.

UNIT V CONSTRUCTION EQUIPMENT
Selection of equipment for earth work - earth moving operations - types of earthwork equipment - tractors, motor graders, scrapers, front end waders, earth movers – Equipment for foundation and pile driving. Equipment for compaction, batching and mixing and concreting - Equipment for material handling and erection of structures - Equipment for dredging, trenching, tunneling,
constraction.pdf
You do not have the required permissions to view the files attached to this post.

CLASS NOTES ON CONSTRUCTION TECHNIQUES, EQUIPMENT & PRACTICE

Sponsor

Sponsor
 

Post Reply

Return to “Study Material”